Construction details for the new Culver’s restaurant included an 8-inch-thickpoured concrete foundation wall, steel framing and anchored masonryveneer. Based upon...
Construction details for the new Culver’s restaurant included an 8-inch-thickpoured concrete foundation wall, steel framing and anchored masonryveneer. Based upon...
The Whitefish Bay High School was originally constructed in 1930. Since then it has received additions in 1941, 1967 and...
In 2010, Keller, Inc. began construction of a free stall milking complex designed to handle up to 380 head of...
The YMCA was built in the 1970's, in 2009 a 14 million dollar addition was to be constructed. The original...
In 2009 the YMCA began construction of a 13 million dollar addition. The new addition was to include a new...
St. Norbert College planned a $1,175,000 addition and renovation to their existing admission center. The new addition consisted of a...
The Affinity Health Group Clinic is a building with both crawl space and full basement lower levels. The structure consisted...
The First Business Center building located on the corner of Hwy 41 and Hwy BB was being sold. The title...
The Blount Street Substation project included the installation of a new underground transmission line. Upon completion of the new underground...
Northern Natural Gas (NNG), headquartered in Omaha, NE, contacted Foundation Supportworks of WI (FSW) to stabilize a settled heater building...
A $3 million dryer addition was proposed with new foundations within and adjacent to an existing one-story building with basement....
In 2011, the City of Sparta was to begin construction of a new pedestrian/snowmobile bridge. The original design called for...